Roadworks to close A1(M) bridge near Welwyn Garden City for nine nights

The A414/A6129 bridge on the A1 will be closed form Monday, December 9 for nine nights from 10pm to

The A414/A6129 bridge on the A1 will be closed form Monday, December 9 for nine nights from 10pm to 5am - Credit: Archant

Roadworks on the A1(M) will close a section of the dual carriage way when essential work is carried out overnight.

Maintenance will be carried out on the A414/A6129 bridge at Junction 4 (Oldings Corner) from Monday, December 9 for nine nights until December 18.

Joints on the structure will be replaced closing the road from 10pm to 5.30am each night.

A diversion will be in place for drivers.

Stephen Hall, Highways Agency Project Sponsor said: “These joints allow the bridge to adapt to changes in temperature without causing damage to the road surface.


You may also want to watch:


“Once completed the bridge will continue to provide safe journeys over the A1(M).

“We have planned the work to minimise disruption and that is why we will be carrying out the maintenance work overnight, when traffic flows are at their lowest.”

Most Read

Become a Supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Become a Supporter
Comments powered by Disqus