Ayot Green Bridge closed for repairs

The bridge will be closed whilst work is carried out. Stock Pic

The bridge will be closed whilst work is carried out. Stock Pic - Credit: Archant

A bridge that carries traffic over the A1(M) will be closed for four days while work takes place.

Ayot Green Bridge, near Welwyn, will be improved by the Highways Agency from today (Monday) to Thursday.

From 9.30am and 4.30pm the bridge will be closed to vehicles with a diversion in place for drivers.

Pedestrians will still be able to walk across the bridge during the work.

Stephen Hall, Highways Agency Asset Manager, said: “The maintenance work will involve the replacement of bridge joints that allow the bridge to expand and contract as temperatures change, ensuring journeys remain safe.


You may also want to watch:


“By carrying out the work now we are reducing the need to close the bridge at short notice for emergency repair work.”

Drivers will be able to follow a signed diversion route via Ayot Green, Ayot St Peter Road, School Lane, London Road and B197 Digswell Hill.

Most Read

When work is not being carried out the bridge will be open to all traffic.

Become a Supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Become a Supporter
Comments powered by Disqus